Aldi Heidelberg | Commercial Electrical Fit-out | 3 Phase Power


Client:

ALDI


Location:

Heidelberg West


Case Study

The technicians at Prolux Electrical Contractors have now completed the electrical construction on their second ALDI supermarket and grocery store, in June 2014. The development of the store was completed within a two month period. This commercial electrical fit-out included refrigeration of sub mains, power and light cabling, hand dryer circuits, 3 phase power, re-lamping, light fittings – internal and external LED downlights, power points and light switches, new ECD service poles, automatic door security cabling and more for this leading global discount supermarket chain. Electrical works also included emergency exit lights, lighting design and retail lighting.

by Alex Lamblin 18 October 2024
Jacobs Engineering | Office Fit-out
by Alex Lamblin 16 October 2024
E&P Financial Group Office Fit-out
by Alex Lamblin 4 February 2024
Client: Schneider Electric
11 January 2024
Client: Dexus Property Group
11 January 2024
Client: Goodman
11 January 2024
Client: Woolworths
by Dom Dedic 11 January 2024
Client: Heritage Bank
by Dom Dedic 11 January 2024
Client: Goodman Property Services
11 January 2024
Client: Cricket Australia
More Case Studies
Share by: