Docklands Studios | Industrial Lighting Installation | Data Cabling


Client:

Docklands Studios


Location:

476 Docklands Drive, Docklands VIC 3008


Value:

$7M

Case Study

Alongside Kane Constructions, Prolux Electrical Contractors were the nominated electricians to deliver this $7 million project, which involved building an extension to the Docklands Studios Melbourne for Stage 2 and the adjoining Workshop. With the installation of industrial lighting, all data cabling, power and exit lighting, the project took over 3595 hours and a period of 7 months to complete. Ensuring minimal disruptions to studio operations, all works were completed abiding by studio schedules.


Ground Floor Annex consisted of:


  • 2 Production Offices
  • 1 Make-up Room
  • 2 Star Dressing Rooms
  • 1 Green Room
  • Wardrobe Area
  • Kitchenette
  • Holding Bay
  • Showers & Bathrooms


Docklands studios comprised of 5 stages, 6 production offices, a workshop and allowance for outdoor construction sets and over 800 vehicles with an accumulated total area of 14,856.


Docklands Studios has been designed with film-makers in mind. Overlooking the Yarra River and a 5 minute drive from Melbourne CBD, it is known as one of the best located studio complexes in the Southern hemisphere. With state of the art technology and industry standard features, including fully sound-proofed stages, air-conditioning, extraction fans, fixed steel grids, catwalks and ample three phase electrical power.


Hosting all types of production in its short history, from international feature films to domestic television series such as Australia’s Got Talent (Seven Network) or Where the Wild Things Are (Warner Brothers), a film version of the dense lyricism and dark imagination of Maurice Sendak’s legendary picture book Where the Wild Things Are.


Docklands Studios is another diverse landmark to add to the most liveable city Melbourne as voted. The team at Prolux Electrical are proud of the exceptional standard of work and commitment undertaken by our employees while completing this project. Congratulations on the success of the extension to all those involved.


Photo credits courtesy: 2017 FILM VICTORIA and dsmelbourne.com

by Alex Lamblin 18 October 2024
Jacobs Engineering | Office Fit-out
by Alex Lamblin 16 October 2024
E&P Financial Group Office Fit-out
by Alex Lamblin 4 February 2024
Client: Schneider Electric
11 January 2024
Client: Dexus Property Group
11 January 2024
Client: Goodman
11 January 2024
Client: Woolworths
by Dom Dedic 11 January 2024
Client: Heritage Bank
by Dom Dedic 11 January 2024
Client: Goodman Property Services
11 January 2024
Client: Cricket Australia
More Case Studies
Share by: