Prolux Electrical Contractors commenced work on the ground floor and level 1, with back to base works. Each floor, approx 4000sq meters required over 300 lights to be installed and 500 work stations complete with office power and data communications per floor. All work stations had to be removed, lighting rewired and upgraded. Wiring of a new lift, LED lighting installation to toilets, feature lighting to foyer and lobby and emergency and exit lighting were upgraded. Prolux had to work very carefully, ensuring remaining services for the other tenants in the building were not disrupted.
GDP Property | Office Power | LED Lighting Installation